Sökning: "joint cost"
Visar resultat 16 - 20 av 184 avhandlingar innehållade orden joint cost.
16. Health economics and its measures in rheumatoid arthritis
Sammanfattning : Objectives: To study: (I) the impact on cost-utility analyses of applying different national EuroQol 5-Dimensions (EQ-5D) preference sets; (II and III) whether, in methotrexate-refractory, early rheumatoid arthritis (RA), the addition of infliximab results in superior health-related quality of life (HRQoL) and may be considered cost-effective, as compared to adding sulfasalazine and hydroxychloroquine; (IV) how costs relate to disability (measured by the health-assessment questionnaire, HAQ), disease activity (28-joint disease activity score, DAS28) and HRQoL (EQ-5D) in RA. Methods: In the observational SSATG register, one-year quality-adjusted life-year (QALY) accumulation of two interventions was compared according to the UK, US, or Danish EQ-5D preference sets. LÄS MER
17. Agile, Resilient and Cost-efficient Mobile Backhaul Networks : Fundamentals of Network Design and Adaptation
Sammanfattning : The exponentially increasing traffic demand for mobile services requires innovative solutions in both access and backhaul segments of 5th generation (5G) mobile networks. Whilst substantial research efforts address the access segment, the backhaul part has received less attention and still falls short in meeting the stringent requirements of 5G in terms of capacity and availability. LÄS MER
18. Essays on joint replenishment and multi-echelon inventory systems
Sammanfattning : This Licentiate thesis addresses the topics of Joint Replenishment and Multi-Echelon Inventory Systems. Both are important parts in the concepts and current trends in Supply Chain Management and Logistics. LÄS MER
19. Joint Positioning and Multipath Radio Channel Estimation and Prediction
Sammanfattning : This thesis investigates the topic of joint positioning and radio channel estimation and prediction. Both positioning and radio channel estimation have a long history of research with many publications but the combination of the two has so far at large been left unexplored. LÄS MER
20. On enhancing joint risk management throughout a project's lifecycle : Empirical studies of Swedish construction projects
Sammanfattning : Due to their complexity, construction projects involve significant risks thatmust be managed in order to meet the main project objectives in terms of cost,time and quality. While some risks can be foreseen at the beginning of aproject and allocated among the project actors, other risks are difficult topredict. LÄS MER