  1. 11. On the Operational Efficiency in Open Pit Mines

    Författare :Ali Beyglou; Håkan Schunnesson; Pablo Segarra; Luleå tekniska universitet; []
    Nyckelord :TEKNIK OCH TEKNOLOGIER; ENGINEERING AND TECHNOLOGY; Mining and Rock Engineering; Gruv- och Berganläggningsteknik;

    Sammanfattning : Open pit mines constitute more than half of global minerals production. Yet most of the large, high-grade, and close to the surface deposits have been depleted or are currently in production. Besides, volatility in commodity prices and stringent environmental regulations limit the up-scaling expansions in large open pits. LÄS MER

  2. 12. Hydrofracturing rock stress measurements in the Baltic shield

    Författare :Bjarni Bjarnason; Luleå tekniska universitet; []
    Nyckelord :TEKNIK OCH TEKNOLOGIER; ENGINEERING AND TECHNOLOGY; Mining and Rock Engineering; Gruv- och berganläggningsteknik;

    Sammanfattning : .... LÄS MER

  3. 13. Rock mass behavior under hydropower embankment dams : results from numerical analyses

    Författare :Alexander Bondarchuk; Luleå tekniska universitet; []
    Nyckelord :TEKNIK OCH TEKNOLOGIER; ENGINEERING AND TECHNOLOGY; Mining and Rock Engineering; Gruv- och berganläggningsteknik;

    Sammanfattning : Bridges are an important element of the infrastructure today. The technical competence has reached high levels in most countries and the limits given to a bridge designer are set by economic restrictions rather than technical skill. LÄS MER

  4. 14. Rock mass behavior under hydropower embankment dams with focus on fracture erosion and rock mass stability

    Författare :Alexander Bondarchuk; Ignacio Escuder-Bueno; Luleå tekniska universitet; []
    Nyckelord :TEKNIK OCH TEKNOLOGIER; ENGINEERING AND TECHNOLOGY; Mining and Rock Engineering; Gruv- och Berganläggningsteknik;

    Sammanfattning : In Sweden there are about 190 large hydropower dams of varying age. According to the definition by the International Commission of Large Dams (ICOLD), if the height of the dam exceeds 15 m it is referred as large. Majority of these dams are of embankment type. LÄS MER

  5. 15. Prediction of rock failures in mines, with application to the Näsliden mine in northern Sweden

    Författare :Torgny Borg; Luleå tekniska universitet; []
    Nyckelord :TEKNIK OCH TEKNOLOGIER; ENGINEERING AND TECHNOLOGY; Mining and Rock Engineering; Gruv- och Berganläggningsteknik;

    Sammanfattning : Continous cut and fill mining will cause increased loading of the roof of the stopes in mining operations. The aim of the present work is to predict what mining levels will induce critically large loads in the roof of the stopes in cut and fill mining and in particular the Näsliden Mine, in Northern Sweden. LÄS MER