Sökning: "transportplanering"
Visar resultat 16 - 20 av 44 avhandlingar innehållade ordet transportplanering.
16. Challenges for ERTMS related to implementation, technology and railway capacity
Sammanfattning : The main purpose of European Rail Traffic Management System (ERTMS) is to remove crossborder barriers and create an interoperable railway network across European countries (Smithet al. 2012). Since its birth, ERTMS has faced several issues regarding interoperability andimplementation. LÄS MER
17. Evaluation of Train Driving with Lineside ATPand ERTMS Signaling
Sammanfattning : From many perspectives there is a need to understand more of how capacity, signal systems, anddriving behavior interact, and naturally since ERTMS is in its early stage, some areas are stillunexplored. The number of retrofitted ERTMS lines and new designed ERTMS lines are increasing inEurope, which implies extra focus on the capacity optimization in the network planning process. LÄS MER
18. Going from Lineside to In-cab Railway Signaling : Driveability Issues and Solutions
Sammanfattning : From many perspectives there is a need to understand more of how capacity, signal systems, anddriving behavior interact, and naturally since ERTMS is in its early stage, some areas are stillunexplored. The number of retrofitted ERTMS lines and new designed ERTMS lines are increasing inEurope, which implies extra focus on the capacity optimization in the network planning process. LÄS MER
19. Improvement of departure time suitability for interregional rail timetables
Sammanfattning : In order to respond to growing interregional rail traffic, rail capacity should be allocated better. To achieve this, one possibility is to optimise suitability of departure times for rail passengers in the timetabling process. LÄS MER
20. Timetable Analysis based on Social Cost and Simulation
Sammanfattning : The timetable is essential for railway traffic. Its design affects rail operations – and by extension all operators, passengers, and freight clients. International practice for capacity allocation varies and there is no common algorithm for designing and evaluating timetable changes. LÄS MER