Sökning: "partial reliability"
Visar resultat 11 - 15 av 61 avhandlingar innehållade orden partial reliability.
11. Implementation and Experimental Evaluation of a Partially Reliable Transport Protocol
Sammanfattning : In the last decade, we have seen an explosive growth in the deployment of multimedia applications on the Internet. However, the transport service provided over the Internet is not always feasible for these applications, since the network was originally designed for other types of applications. LÄS MER
12. A Study of Partially Reliable Transport Protocols for Soft Real-Time Applications
Sammanfattning : The profileration of multimedia applications, such as streaming video, teleconferencing, and interactive gaming has created a tremendous challenge for the traditional transport protocols of the Internet – UDP and TCP. Specifically, many multimedia applications are examples of soft real-time applications. LÄS MER
13. On reliability-based design of rock tunnel support
Sammanfattning : Tunneling involves large uncertainties. Since 2009, design of rock tunnels in European countries should be performed in accordance with the Eurocodes. The main principle in the Eurocodes is that it must be shown in all design situations that no relevant limit state is exceeded. LÄS MER
14. Quality on single-track railway lines with passenger traffic : Anlytical model for evaluation of crossing stations and partial double-tracks
Sammanfattning : Railway transportation is showing a substantial increase. Investments in new infrastructure, new fast and comfortable vehicles, and high frequency of service are important factors behind the increase.Infrastructure configuration and timetable construction play important roles in the competitiveness of railway transportation. LÄS MER
15. Managing uncertainties in geotechnical parameters : From the perspective of Eurocode 7
Sammanfattning : Geotechnical engineering is strongly associated with large uncertainties. Geotechnical site investigations are made only at discrete points and most of a soil volume is never tested. A major issue is therefore how to cost effectively reduce geotechnical uncertainties with respect to structural performance. LÄS MER