Sökning: "bridge launching"
Hittade 4 avhandlingar innehållade orden bridge launching.
1. Serviceability Limit State for Steel Girders during Bridge Launching - A Patch Loading Problem
Sammanfattning : Incremental launching is a construction method in which bridge girders are first assembled in the vicinity of the future permanent position of the bridge. When the elements have been welded together the girders are launched to their permanent position. LÄS MER
2. Patch loading resistance of plated girders : ultimate and serviceability limit state
Sammanfattning : Patch loading or partial edge loading of steel girder webs is a load case where a concentrated force is introduced perpendicular to the flange of a girder. This usually induces a local failure of the girder web in the vicinity of the loaded flange. LÄS MER
3. Plate buckling resistance : patch loading of longitudinally stiffened webs and local buckling
Sammanfattning : Incremental launching of steel bridges is a demanding undertaking, on the erection site as well as on the designers desk. Not seldom, the structure itself is during the launching subjected to high concentrated forces on the lower flange when passing over the launching shoe or a intermediate support (e.g. column). LÄS MER
4. Patch loading of stainless steel girders : experiments and finite element analyses
Sammanfattning : This thesis deals with the behaviour of stainless steel girders subjected to patch loading. The current loading situation arises for example at beam- column connections or at crane girders where the load is travelling along a girder. At bridge launching it is also important to consider patch loading. LÄS MER